Finnish Steel Painting (FI)
Spray- and dying booths, blast room and washing facility
Surface Treatment Facilities for Finnish Steel Painting
We are proud to have delivered a comprehensive surface treatment solution for Finnish Steel Painting, featuring a tunnel line designed to optimize efficiency and quality.
Project Highlights:
- Tunnel Line: 88 x 10 meters, including rail systems for streamlined operations.
- 3 Spray/Drying Booths: Equipped with an Energy-Saving Package and air handling units mounted under the roof for enhanced performance.
- Blast Room: Features a scraper floor and automatic recycling of abrasives for efficient and sustainable blasting.
- Washing Facility: Integrated for thorough preparation of surfaces prior to coating.
This state-of-the-art setup enhances productivity while supporting Finnish Steel Painting’s commitment to energy efficiency and high-quality surface treatment.