Bane Nor (NO)
Paint booths and Energy-Saving-Package for Bane Nor
Ventherm proudly presents custom-designed paint booths tailored for Bane NOR. This extensive facility spans 113 meters in length and incorporates cutting-edge features to ensure high efficiency and sustainability.
Project Highlights:
- 10 Air Handling Units (AHUs): Each unit delivers a capacity of 44,000 m³/h, providing robust ventilation and climate control.
- 10 Energy-Saving Packages: Integrated to enhance overall efficiency and reduce energy consumption.
- Heat Recycling System: Engineered to operate efficiently at external temperatures as low as -40°C, maximizing heat reuse.
- Variable Frequency Drives (VFDs) on All Motors: Ensures precise motor control, enhancing efficiency and reducing energy waste.
- 3D Operator Platforms: Improve accessibility and operational control for optimal performance.
- Paint Mix Room: Dedicated space designed to facilitate efficient and safe paint preparation.
Ventherm’s Plug-and-Paint system guarantees superior performance and energy efficiency, making it the ideal solution for Bane NOR’s train maintenance needs.