Vestas (DK)

Case Vestas

Vestas (DK) New Plug-and-Paint© surface treatment plant for Vestas New Plug-and-Paint© surface treatment plant with: Blasting Metallization Painting IR-drying Previous Next More wind Power cases All cases by industry Video references

Skagen Sandblæseri (DK)

Case Skagen Sandblæseri

Skagen Sandblæseri (DK) Updating Paint booth, Wall-Man 3D operator platforms Updating and extension of 714 m2 zone ventilated paint booth. Rebuilt as a separate fire section according to applicable standards. Wall-Man 3D operator platforms on the walls. Previous Next More wind Power cases All cases by industry Video references

Skagen Blade Technology (DK)

Case Skagen Blade Technology

Skagen Blade Technology (DK) Spray- and drying booths, Blast room and Paint mix room 2 Spray/drying booths 14 x 7 x 6 m, 65.000 m3/h, gas heated with 60% heat recycling, special fire-doors 1 Blast room 14 x 7 x 6, 35.000 m3/h, special fire-doors, recycling unit with scraper floor system 1 Metalization room 14 […]

Bladt Industries, Lindø (DK)

Case Bladt Industries, Lindoe

Bladt Industries, Lindø (DK) Monopile lines, air exchange, combined blasting and painting room 4 Combi monopile lines 80 x 20 x 15 m 500.000 m3 air exchange Combined blasting and painting Previous Next More wind Power cases All cases by industry Video references

Yamamah Steel (SA)

Windtower paint booths for Yamaha Steel

Yamamah Steel (SA) Two Windtower paint booths designed for Yamaha Steel, Saudi Arabia 2 pcs. Windtower paint booths 84 x 8 x 8m. 150.000 m3 air exchange. 2 pcs. Windtower blast booths 42 x 8 x 8m. Blasting and painting, Previous Next More wind Power cases All cases by industry Video references

Aker Solutions (NO)

Aker Solution Norge

Aker Solutions (NO) Two Lines for jackets designed for Aker Solutions in Norway 2 pcs. Lines for jackets 60 x 16 x 10m. Fully automated, with automatic programming robots 100.000 m3 air exchange Blasting and painting Parts – Jackets 2.000 ton Previous Next More wind Power cases All cases by industry Video references

SeAH Wind (Korean – UK)

SeAH Wind Combi Monopile Lines

SeAH Wind (Korean – UK Based ) 2 Combi Monopile Lines for SEAH Wind 3 pcs. Combi monopile lines 135 x 25 x 17m. 900.000 m3 air exchange Combined blasting and painting Parts 3.000 ton Previous Next More wind Power cases All cases by industry Video references

Siemens Gamesa (USA)

Siemens Wind Power

Siemens Gamesa (USA) Two spray booths in custom design for Siemens Wind Power 2 pcs. Spray booth 90 x 8 x 8 m, 150.000 m3/h Gas heated with 75% heat recycling Unique zone-ventilation-system reduces the energy consumption to ¼ despite the size of the installation. 1 pcs. Drying booth 90 x 12 x 7 m, […]

Siemens Gamesa (DK)

Ventherm at Siemens Wind Power DK

Siemens Gamesa (DK) Two spray and drying booths in custom design 2 Spray/Drying booths 90 x 8,5 x 10 m 110.000 m3/h Water heated with 80% heat recycling Unique zone-ventilation-system Reduces the energy consumption to ¼ despite the size of the installation. Previous Next More wind Power cases All cases by industry Video references

Siemens Gamesa (UK)

Siemens Wind Power UK

Siemens Gamesa (UK) Two spray booths in custom design for Siemens Wind Power 2 x spay booth 82 x 10,4 x 10 meters Custom design Multi-zone system according to EN-12215 70% heat recycling system Humidity control system 70 ton equipment on top of the booths Previous Next More wind Power cases All cases by industry […]