Siemens Gamesa (USA)

Siemens logo

Two spray booths in custom design for Siemens Wind Power

  • 2 pcs. Spray booth 90 x 8 x 8 m, 150.000 m3/h
  • Gas heated with 75% heat recycling
  • Unique zone-ventilation-system reduces the energy consumption to ¼ despite the size of the installation.
  • 1 pcs. Drying booth 90 x 12 x 7 m, 25.000 m3/h, gas heated with 75% heat recycling
  • 1 pcs. Blast room 90 x 9 x 7 m, 45. 000 m3/h, gas heated with 75% heat recycling
  • Munkebo/Clemco equipment.
siemens usa